Trail Maintenance Projects
Major Projects:
Major Projects:
**Dump Bridge #1 (Reinforcing the bank to prevent future washouts) and re-setting the bridge in place. (we are currently searching for a longer bridge to span this area so the bridge will be back in its original location for the 2010-2011 season)
**Re Decking Tex-Tech Bridge
**Re Decking bridge on Town Garage to Blue Road connecter trail
Establish new trail between Annabessacook and
General Projects:
**re-routing trail in east Monmouth between Tillson road and route 135 to best avoid the "bone yard" which is very rocky and a tough section to work with. Awaiting further info from landowner. (looking to do in prep for 2010 and 2011 season)
**re-routing or diverting water on trail between Prescott Hill and Tillson Road (been an issue look for solutions for this bad corner it's a tricky spot)
**Waugan Trail from the Waugan bridge out to Annabessacook (anything we can do to this trail so that we can more easily and safely get the blazer and drag through here (got blazer through here for the first time during 2008-2009 season))
**Cutting back brush along length of Monmouth Academy Athletic field bank back to the rock wall. Chipping cut materials to use on trails.